軟考備考每日試題(210820)
2021下半年各省市軟考報名即將開始,大家可以實時查看我們的《2021下半年全國各省市軟考報名繳費時間公布》,以跟進最新報名時間信息。
每期慧翔天地小編都會附上5~10道軟考綜合測試題,以幫助大家達到練習的效果,本期軟考試題答案會附加在下一期的結尾。大家如果想了解2021年軟考考試報考流程、報考時間、報考要求、軟考報考費用、軟考成績查詢、軟考報考資格測評等等均可訪問站內進行了解。
71、()seeks to perform root cause investigation as to what is leading identified trends.
A、Problem management
B、Incident management
C、Change management
D、Knowledge management
72、()provides guidance for the development and improvement of capabilities for introducing new and changed service into supported environment.
A、Service strategy
B、Service transition
C、Service design
D、Service operation
73、()is the process of managing procurement relationships,monitoring contract performance,and making changes and corrections as appropriate,and closing out contracts.
A、Control Procurements
B、Conduct Procurements
C、plan Procurement management
D、Procurement strategy
74、The()is a hierarchical decomposition of the total scope of work to be Carried out by the project team to accomplish the project objectives and create the required deliverables.
A、project scope statement
B、work package
C、WBS
D、project scope plan
75、Risk()acknowledge the existence of a threat,but no proactive action is taken。
A、avoidance
B、transfer
C、mitigate
D、acceptance
(210819)答案
66、67答案:A、D
解析:生產乙產品的利潤高于甲產品,所以為了獲得最大利潤,必須盡可能多的生產乙產品。根據題干,最多可生產的乙設備為6萬臺,剩余設備和材料可生產1萬臺設備,每天的利潤為6*4+2=26萬元。
68、答案:D
解析:和上半年考過的運籌學題目類似,管理科學基礎最小生成樹知識點,信息系統項目管理師第3版官方教材p864。保證每個點有最短的一條線連接即可。
69、答案:C
解析:假設商品的成品為X元,(100-X)*60=(100-4-X)*(60+3*4),得出成本為76元。
70、答案:C
解析:21塊舊電池可以換7塊新電池,7塊新電池用舊了,可以換2塊新電池,加之前剩的1塊電池,還可以換1塊新電池,所以換的電池總數為7+2+1=10塊。