1、估算活動(dòng)資源的工具與技術(shù)不包括:
A、類比估算
B、參數(shù)估算
C、備選方案分析
D、親和圖
2、A project team has weekly integrated change control meeting s with the steering committee.During these meetings,attendees discuss the urgency of correcting deflects that cause change requests,and then vote on their severity.After the committee agrees on the severity and priority of the change requests,what should the project manager update?
項(xiàng)目團(tuán)隊(duì)每周與指導(dǎo)委員會(huì)一起召開一次整體變更控制會(huì)議.在這些會(huì)議期間,與會(huì)者討論糾正導(dǎo)致變更請求的缺陷緊迫性,然后會(huì)對其嚴(yán)重性進(jìn)行投票.在委員會(huì)同意變更請求的嚴(yán)重性和優(yōu)先級(jí)后,項(xiàng)目經(jīng)理應(yīng)該更新哪-份文件?
A、Change log變更日志
B、Change management plan變更管理計(jì)劃
C、Scope baseline范圍基準(zhǔn)
D、Requirements traceability matrix需求蹤矩陣
3、在制定項(xiàng)目章程過程中,項(xiàng)目發(fā)起人宣布裁減人員,導(dǎo)致多個(gè)關(guān)鍵項(xiàng)目崗位上,只有一名資源可以滿足角色要求。這會(huì)影響項(xiàng)目章程的哪個(gè)元素?
A、整體項(xiàng)目風(fēng)險(xiǎn)。慧翔天地
B、項(xiàng)目目標(biāo)。慧翔天地
C、商業(yè)目的。慧翔天地
D、項(xiàng)目發(fā)起人職權(quán)。慧翔天地
4、在Scrum項(xiàng)目中,采用下列哪種工具來追蹤計(jì)劃的工作項(xiàng)?
A.Sprint待辦事項(xiàng)
B.發(fā)布燃盡圖
C.產(chǎn)品待辦事項(xiàng)
D.Sprint燃盡圖
5、下列哪一項(xiàng)屬于估算用戶故事規(guī)模的技術(shù)?
A.專家判斷
B.計(jì)劃補(bǔ)充
C.燃盡圖
D.看板補(bǔ)充
PMP備考每日試題(240126)點(diǎn)擊跳轉(zhuǎn)
(240126)答案
6、A
7、A
8、C
9、C
10、D