1、A project is going well and key performance indicators(KPI S)are positive.A new market need arises that requires adding an extra feature to the scope.What should the project manager do?
項目進(jìn)展順利,關(guān)鍵績效指標(biāo)(KPD為正數(shù).這時出現(xiàn)了新的市場需求,需要在范圍中添加額外的功能。項目經(jīng)理應(yīng)該做什么?
A、Reject the extra feature to keep the project on track.拒絕額外的功能.以保持項目正常進(jìn)行。
B、Create a separate project to address the market nee.創(chuàng)建一個單獨的項目,以解決市場需求。
C、Review the market need with change control board(CCB).與變更控制委員會(CCB)一起審查市場需求。
D、Incorporate the extra feature into the scope.在范圍中包含額外的功能。
2、A project manager discovers that a work package has been completed for substantially less cost than planned.Which oft he following is NOT among the first things to consider doing?()
項目經(jīng)理發(fā)現(xiàn),某一工作包實際花費比預(yù)算少很多。以下都是首先要考慮做的事情,除了∶()
A、Make sure all project processes were followed確保遵循了所有的項目流程。
B、Make sure the right resources were used.確保合理地使用了資源。
C、Make sure all the work was done.確保所有工作已經(jīng)完成。
D、Identify ways to increase the result.識別增加結(jié)果的各種方法。
3、項目經(jīng)理知道至少有20個潛在供應(yīng)商能夠滿足項目需求,但只收到兩份建議書,在項目的采購過程中,項目經(jīng)理應(yīng)事先完成哪項工作?
A、創(chuàng)建一支多學(xué)科評審團(tuán)隊,擁有采購文件中包含的各個領(lǐng)域?qū)I(yè)知識
B、調(diào)查市場,包含行業(yè)業(yè)及某些供應(yīng)商能力調(diào)查
C、在報紙或?qū)I(yè)貿(mào)易出版物上投放廣告
D、開發(fā)相應(yīng)的付款系統(tǒng)
4、While estimating project costs,a project manager works with a subject matter expert(SME)who has historically underestimated the effort necessary to deliver project requirements.In all other areas,however,the SME is a good contributor,well respected,and often requested by stakeholder.To proactively mitigate the risk of underestimation,what should the project manager do?
在估算項目成本時,項目經(jīng)理與一位主題專家(SME)合作,該專家曾有低估交付項目需求所需工作的歷時.然而,在所有其他領(lǐng)域,該主題專家是一位很好的貢獻(xiàn)者,備受尊重,并且經(jīng)常有相關(guān)方需要他.若要主動減輕低估項目工作的風(fēng)險,項目經(jīng)理應(yīng)該怎么做?
A、Periodically review objectives and requirements with the SME during estimation and use other resources to review the submitted estimates.在估算期間與該主題專家定期審查目標(biāo)和需求,并使用其他資源審查提交的估算.
B、Notify project stakeholders that any estimates submitted by the SME must be increased by 20%percent.通知項目相關(guān)方,該主題專家提交的任何估算必須增加20%.
C、Ignore previous issues with estimates from this SME and continue with the process unchanged.忽略與該主題專家有關(guān)的估算問題,并繼續(xù)保持該過程不變
D、Remove the SME from the project and request a resource who can provide more accurate estimates.將該主題專家從項目中排除并請求可提供更準(zhǔn)確估算的資源
5、此項目章程要求使用一種新的方法來延長公司某一半成品產(chǎn)品的生命周期。項目經(jīng)理來自于工程部門,團(tuán)隊成員來自于產(chǎn)品管理及市場部。當(dāng)其中一位相關(guān)方通知項目團(tuán)隊有一種新的方法能完成某一工作包之后,初步范圍說明書及項目計劃就完成了。甚至他們還提供了一封技術(shù)審核郵件來說明新方法的確比老方法要快。項目經(jīng)理跟這個部門以前也有類似的經(jīng)驗,所以他希望同樣的經(jīng)歷也在這個項目上發(fā)生。首先,項目經(jīng)理應(yīng)該做什么?
A、聯(lián)系這個部門,再次抱怨他們由于沒能及時提供范圍而錯失了最終期限
B、評估進(jìn)度變更如何影響完成此工作包的成本及產(chǎn)品質(zhì)量
C、確認(rèn)是否能把矩陣環(huán)境變成職能組織,這樣就會避免同其他部門的界面接觸
D、詢問此部門是否還有其他變更
(241204)答案
6、B
7、A
8、A
9、C
10、C