46、Which evaluation technique is used as an essential planning component of controlling Schedule?
A.Schedule management plan
B.Estimate at Completion(EAC)
C.Actual Cost of Work Performed(ACWP)
D.Variance analysis
46、下列哪一項評估技術為控制進度的主要規劃部分
A.時間管理計劃
B.估算完成價值
C.已完成工作實際成本
D.差異分析
47、Abraham Maslow developed a model to explain the motivational process in relation to the way human needs change throughout an individual’s developmental life cycle.This model has five levels.Responsibility,a sense of accomplishment,and a sense of competence are examples of needs at which level?
A.Self-actualization
B.Social
C.Esteem
D.Physiological
47、亞伯拉罕?馬斯洛提出了一個五個級別的需求層次理論,解釋了一個人的整個生命發展周期中不同類型的需求。責任、成就感和能勝任的感覺屬于下列哪個級別的需求
A.自我實現
B.社會比
C.尊重
D.生理上
48、Two project team members are engaging in open verbal confrontation at project meetings over project issues.The project manager is not able to control this situation when they arise.This situation could have been avoided if the project manager had established ground rules during which process group?
A.Initiation
B.Execution
C.Monitoring and controlling
D.Planning
48、兩位項目團隊成員在項目會議上就項目問題發生言辭沖突,發生這種情況時項目經理無法控制。如果項目經理在哪個過程組制定一些基本規則就可以避免
A.啟動
B.執行
C.監控
D.規劃
49、How should a project manager interpret an 8-point run in a process with 1 point located out of control limit?
A.It is a normal situation,nothing should be done.
B.Control limits should be widened.
C.It is an abnormal situation;production processes should be corrected.
D.It is a warning signal;quality measurement systems should be updated.
49、生產過程運行圖中有8個點,其中有一個點在控制界限以外,項目經理如何解讀
A.這屬于正常情況,不用采取行動。
B.應放寬控制范圍。
C.這屬于不正常情況,生產流程需改進。
D.這是一個警告信號,質量標準系統需升級。
50、A project manager for the seller is told by her management that the project should do whatever possible to be awarded incentive money.The primary objective of incentive clauses in a contract is to:
A.reduce costs for the buyer.
B.help the seller control costs.
C.synchronize objectives.
D.reduce risk for the seller by shifting risk to the buyer.
50、一賣方的管理層告訴其項目經理該項目應想方設法取得獎金。合同中獎勵條款的主要目的是
A.降低買方的成本
B.幫助賣方控制成本
C.同步目標
D.通過轉移買方的風險來降低賣方的風險
(211111)答案
41、D
42、B
43、B
44、A
45、D