PMP備考每日試題(211108)
限時免費領取,2022年度公益大課《巧用項目管理輕松突破職業瓶頸》,慧翔天地手把手帶你輕松學項目管理,從項目管理小白走向職場巔峰5天課程免費學,快樂成長,更有超低PMP?培訓優惠,還有豪禮贈送,詳情可以直接點擊上方圖片進入活動報名頁。
每期慧翔天地小編都會附上5~10道PMP?綜合測試題,以幫助大家達到練習的效果,本期PMP試題答案會附加在下一期的結尾。大家如果想了解2022年PMP?考試報考流程、報考時間、報考要求、PMP?報考費用、PMP?考試地點、PMP?成績查詢、PMP?報考資格測評等等均可訪問站內進行了解。
31、A project audit concludes that project scope is well defined and the WBS and schedule are reasonably detailed and realistic.However,many project team members are unclear about their roles and work expectations.Which of the following should the project manager undertake as a first priority to address this issue?
A.Develop a resource loaded schedule and level to ensure that resource loadings align with availability.
B.Meet with each member of the project team to determine what they should be doing.
C.Prepare with team members a response matrix mapped to work to give a clear understanding of role.
D.Review a revise the project organization structure to better define the reporting Lines.
31、項目審計得出結論是:項目范圍定義良好,WBS和進度表合理、詳細、實際,但是許多項目團隊成員對他們的角色和工作期望仍不清楚。若要解決這個問題,項目經理應該將下列哪一項列為首要重點?
A.制定資源加載進度和加載水平,確保資源負荷與可用性一致。
B.與每名項目團隊成員面談確定他們應該做什么。
C.與團隊成員一起制定與工作細目相對應的責任分配矩陣,給出有關角色職責的清晰解釋。
D.評審并修訂項目組織結構,以便更好的確定報告層級。
32、A Team member was recently promoted as project manager and has been assigned a$2million The department manager schedules a meeting to review the project charter within two weeks.What should the project manager do next?
A.Create the project scope statement.
B.Meet with the sponsor to define the business needs.
C.Schedule a kick-off meeting with team members.
D.Review the project management plans with the stakeholders.
32、一名團隊成員最近被提升為項目經理,被任命管理一個200萬美元的項目。部門經理安排召開會議,在兩個星期內評審項目章程。項目經理下一步應該怎么做
A.制定項目范圍說明書。
B.與項目發起人會面,確定商業需求。
C.與團隊成員安排一次項目啟動大會。
D.與項目干系人者一起評審項目管理計劃。
33、A company would like their project selection models stored in a computer database to serve as
input for their new projects.The company is updating which of the following
A.Project management information system
B.Organizational process assets
C.Enterprise environmental factors
D.Commercial database
33、一家公司希望將項目的選擇模型存儲在計算機數據庫中,以作為新項目的依據,這家公司在更新什么
A.項目管理信息系統
B.組織過程資產
C.事業環境因素
D.商業數據庫
34、Some people believe that to have an effective conversation,a distance of about 20 inches(51 centimeters)between the two parties involved is required.In certain cultural groups,however,the normal conversational distance is in the range of 14 to 15 inches(36 to 38 centimeters);and some groups say 9 to 10 inches(23 to 25 centimeters)is ideal.People from some cultural groups may keep a door open during a negotiation,whereas others may prefer to close the door.Some people feel they should be separated from another person by a desk.This area of nonverbal communication is important for cross-cultural communication.It is known as
A.Proxemics
B.Personal space dynamics
C.Posturing
D.Linguistics
34、一些人相信,交談雙方的距離在20英寸(51厘米)比較合適,而另一些人認為,14到15英寸(36到38厘米)比較好,還有一些人則認為9到10英寸是比較理想的距離。某些文化群體的人習慣在談話過程開著門,而另一些則更愿意關著門談話。也有一些人喜歡在談話的時候與對方間隔著一張桌子。這種非語言溝通的研究對于跨文化交流是很重要的。它被稱作
A.空間關系
B.個人空間動力學
C.姿態學
D.語言學
35、At the conclusion of a project,there is a compilation of information that serves as the memory and history of the project.That document evaluates the overall success of the project including its strengths and weakness,organization and techniques used to get results.What is the collection of information called?
A.Stakeholder feed back
B.Post-implementation audit
C.Lesson learned
D.Final project report
35、在結束項目階段,需要執行信息編制,作為項目的歷史紀錄。文件評估了項目的整體成功性,包括項目的優勢、劣勢、組織以及用于獲得結果的技術。這個信息收集過程稱作什么?
A.項目干系人的反饋
B.項目實施后的審計
C.經驗教訓
D.最終項目報告
(211105)答案
26、B
27、A
28、A
29、B
30、A